page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50 page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
< prev - next > Energy Biogas Biogas Digest Vol 2 (Printable PDF)
Table 3: Appropriate pipe diameter for different pipe lengths and flow-rate (maximum
pressure loss < 5 mbar)
Galvanized steel pipe
PVC pipe
Length [m]:
20
60
100
20 60
100
Flow-rate [m3/h]
0.1 1/2" 1/2" 1/2" 1/2" 1/2" 1/2"
0.2 1/2" 1/2" 1/2" 1/2" 1/2" 1/2"
0.3 1/2" 1/2" 1/2" 1/2" 1/2" 1/2"
0.4 1/2" 1/2" 1/2" 1/2" 1/2" 1/2"
0.5 1/2" 1/2" 3/4" 1/2" 1/2" 1/2"
1.0 3/4" 3/4" 3/4" 1/2" 3/4" 3/4"
1.5
3/4" 3/4" 1"
1/2" 3/4" 3/4"
2.0 3/4" 1" 1" 3/4" 3/4" 1"
The values in this table show that a pipe diameter of 3/4" is suitable for flow rates up to
1.5 m3/h and distances up to 100 m (PVC pipe). Therefore one could select the diameter
of 3/4" as single size for the hole piping system of small biogas plants. Another option is to
select the diameter of l" for the main gas pipe and 1/2" for all distribution pipes to the gas
appliances.
Lay-out of the piping system
PVC can be used for all underground pipes or pipes that are protected against sun light and
out of the reach of children. For all parts of the piping system that are above ground one
should install galvanized steel pipes. Therefore it is recommended to use l" G.I. steel pipes
for the visible part of the piping system around the biogas digester. For the main pipe one
uses l" PVC pipe placed underground. The distribution pipes should be 1/2" G.I. steel pipes
or PVC pipes, depending whether they are installed above or under the wall plastering. But
even though G.I. pipes are less susceptible to damage, placing them underground should
always be the preferred solution.
PVC pipes have to be laid at least 25 cm deep underground. They should be placed in a
sand bed and be covered with sand or fine earth. One should carefully back-fill the ditches in
order to avoid stones lying directly above the pipe.
When the piping is installed - and before refilling the ditches - it has to be tested for possible
gas leakage. This can be done by pumping air into the closed piping system up to a pressure
that is 2.5 times the maximum gas pressure of the biogas plant. If pressure loss occurs within
few hours, every joint of the piping system has to be checked with soap water. Soap-bubbles
indicate any leakage of gas.
Water traps
Due to temperature changes, the moisture-saturated biogas will form inevitably condensation
water in the piping system. Ideally, the piping system should be laid out in a way that allows
a free flow of condensation water back into the digester. If depressions in the piping system
can not be avoided, one or several water traps have to be installed at the lowest point of the
depressions. Inclination should not be less than 1%.
Often, water traps cannot be avoided. One has to decide then, if an ’automatic’ trap or a
manually operated trap is more suitable. Automatic traps have the advantage that emptying -
which is easily forgotten - is not necessary. But if they dry up or blow empty, they may cause
heavy and extended gas losses. In addition, they are not easily understood. Manual traps are
simple and easy to understand, but if they are not emptied regularly, the accumulated
condensation water will eventually block the piping system. Both kinds of traps have to be
installed in a solid chamber, covered by a lid to prevent an eventual filling up by soil.